2026-05-19
Tempo with 2 x 12 min
- Id: 2026-05-19-tempo-with-2-x-12-min
- Title: Tempo with 2 x 12 min
- Kind: workout
- Discipline: bike
- Surface: road
- Priority: key
- Planned time: unscheduled
- Duration: 2:00-2:15
- Distance: ~55-65 km
- Intensity: Z2 with tempo work
- Location: Edmonton, AB
Objective
Reintroduce sustained pressure early enough that the Ghost build does not start behind.
Goal
- Restore controlled sub-threshold pressure.
- Start rebuilding seated climbing durability after the travel block.
Reasoning
- The runway to Ghost is too short for a purely soft re-entry.
- Slightly longer reps are more useful than shorter tempo intervals because the June target is a long gravel race, not a punchy road event.
Workout plan
- Warm up 30 min progressive.
- Ride 2 x 12 min at 80-86% FTP, seated and smooth, 6 min easy between.
- Finish with steady endurance.
Structured workout
- Primary intensity metric: percentOfFtp
- Step: Warm-up, 30 min, 55-72, warmUp
- Repetition block: 2 reps
- Step: Tempo, 12 min, 80-86, active
- Step: Recovery, 6 min, 55-65, rest
- Step: Endurance, 50 min, 65-75, active
- Step: Cool-down, 10 min, 50-60, coolDown
Recovery
- Quiet afternoon and normal dinner.
Fueling
- Start fed.
- Use 60-75 g carbohydrate per hour.
Constraints
- Keep it controlled and seated, not threshold.
Notes
This is the first sustained-pressure ride back, not a test.